Substance Inspection: If the insulating water for examination needs to be drawn down, make sure you have equipment for clear and dried storage of the water throughout inspection and for filtering the fluid prior to refilling the tank. It is vital that most associated equipment found in the handling of the liquid (hoses, pumps, etc.) are also really clean and dry. If this gear was applied before with an alternative type of substance, clear all contaminated items. When you remove the fluid, their stage should not move under the most effective of windings.

Force Preservation: Liquid-filled transformers might be stored outdoors upon delivery. Ample gasoline pressure must certanly be preserved allowing a confident force of transformer one psi to 2 psi at all times, actually at minimal ambient temperature. The pressure-vacuum gauge, if given the transformer, may display force variations with ambient temperature. Stress and normal temperature parts should really be recorded regularly. The manufacturer's instructions must be known for storage of accessories.

Inspection and filling: You should make your final inspection of the transformer before it's revived, particularly if any work has been done in the tank. All electrical contacts should really be tested for tightness. All bushings must certanly be checked for tightness of gaskets, and all bring lead associations should be checked. Electric clearances inside the container must certanly be checked. One ultimate check must be manufactured to ensure all instruments have already been removed Surge arresters: When used, rise arresters must be mounted and attached to.

Filling: Following using whole voltage, the transformer must be kept under statement all through the first several hours of function under load. Following several days, check the gas for oxygen content and dielectric strength. All conditions and pressures should be checked in the transformer reservoir during the initial week of operation. Aside from special styles, transformers might be operated at their scored kVA if the common normal temperature of the cooling air does not surpass 86'F (30'C) in just about any 24-hr period, and the elevation does not exceed 3300 ft.

Weergaven: 1

Opmerking

Je moet lid zijn van Beter HBO om reacties te kunnen toevoegen!

Wordt lid van Beter HBO

© 2024   Gemaakt door Beter HBO.   Verzorgd door

Banners  |  Een probleem rapporteren?  |  Algemene voorwaarden