If you're applying for a new electricity connection or upgrading your electrical load in Delhi, chances are you've come across the term BSES wiring test report. This document is a mandatory part of the application process for customers of BSES Rajdhani Power Limited (BRPL) and BSES Yamuna Power Limited (BYPL).
But what exactly is a wiring test report? Why is it important? And how can you get it quickly and hassle-free? Let’s break it down.

What Is a BSES Wiring Test Report?
A Wiring Test Report is an official certificate issued by a licensed electrical contractor or supervisor after thoroughly inspecting the electrical installation at your premises.
This report certifies that the wiring has been done safely, correctly, and complies with the CEA (Central Electricity Authority) regulations and BSES safety standards.
Without this report, BSES will not approve your new connection, load enhancement, or even changes in your meter location.
Why Is the Wiring Test Report Important?
The main reasons the wiring test report is crucial are:
By demanding this report, BSES ensures that only safe and legal wiring installations are connected to the power grid.
How to Get Your BSES Wiring Test Report
1. Hire a Licensed Electrical Contractor
The first step is hiring a Delhi-licensed electrical contractor (LEC).
Only electricians or contractors approved by the Delhi government and registered with BSES can legally perform the wiring test and issue the report.
Always ask for their license number and verify it if needed.
2. Complete the Internal Wiring
Before calling for the wiring test:
A half-finished site will only delay your inspection.
3. Request a Wiring Test and Inspection
Once your setup is ready, schedule an inspection with your licensed electrician.
They will physically check the wiring, perform necessary tests (like insulation resistance and earth continuity tests), and ensure that everything complies with BSES and CEA guidelines.
If everything is satisfactory, they will fill out and sign the Wiring Test Report Form.
4. Submit the Report to BSES
After receiving the signed wiring test report, you must upload it online (through the BSES portal) or submit it physically at the respective BSES office, depending on your application type.
Pro Tip: Double-check that the report is complete and correctly filled out — incomplete forms are a common cause of application rejection.
Common Mistakes to Avoid
Using Unlicensed Electricians
If your report is not issued by a licensed contractor, BSES will reject it outright. Always use registered professionals.
Incomplete or Faulty Wiring
Poor-quality installation or missing mandatory safety devices like ELCBs will cause you to fail the test.
This means rework, extra costs, and unnecessary delays.
Late Planning
Many applicants start thinking about the wiring report only after applying for a new connection.
Ideally, involve your licensed electrician early during the wiring work itself to avoid last-minute surprises.
How Long Does the Process Take?
Fast action from your side can dramatically shorten the timeline.
Final Thoughts
Getting your BSES wiring test report doesn't have to be stressful.
By planning ahead, hiring a licensed electrician, and ensuring your wiring is top-notch, you can complete this step quickly and move one step closer to your new or upgraded electricity connection.
If you need your wiring test report urgently, it’s always smart to connect with a reputed licensed contractor who knows BSES guidelines inside and out.